Home · Compliance · ISO 50001
ISO certification · ISO 50001Energy

Keybridge prepares ISO 50001 certification in Iraq and Kurdistan.

Measure energy use and manage improvements against defined performance indicators. We confirm the scope and the buyer’s stated requirements before preparation starts. Buyer acceptance depends on the certificate scope, issuing body and the requirements set by the buyer. We review those requirements before preparation.

ISO 50001 Energy management systems

ISO 50001 at a glance

Published
August 2018. ISO 50001:2018 is the current edition. It replaced ISO 50001:2011.
Structure
Annex SL high level structure. 10 clauses. Clauses 4 to 10 carry the auditable requirements, and clause 6 adds the energy review, the baseline and the indicators.
Certifiable
Yes. The company is certified for a stated boundary and scope that names the sites and the energy uses inside it.
Certificate validity
The assessment body confirms the applicable schedule and continuing requirements for your scope.
Surveillance
The assessment body confirms the applicable schedule and continuing requirements for your scope.
Audit days, 10 to 50 people
The assessment body confirms the applicable schedule and continuing requirements for your scope.
What the scope covers
Only the sites and activities written into the scope. Anything left out of it is not covered.
What the certificate says
The company name, the standard, the scope and the dates the certificate runs.
Language of the system
We write the documentation in the language the company works in: Arabic, Kurdish or English. Meter readings and indicator reports are kept in one language across all sites.

What ISO 50001 is

ISO 50001:2018 is the international standard for an energy management system. It asks a company to measure how much energy it uses and where, fix a baseline, set indicators, and show the numbers moved in the right direction. It is the only common management standard that requires a measured improvement in energy performance itself.

What the standard requires

  1. Clauses 1 to 3 cover scope, normative references and terms. Clauses 4 to 10 are the requirements an auditor checks.
  2. Clause 4, context. Set the boundary and the scope of the energy management system by site, by process and by energy source.
  3. Clause 5, leadership. Management signs the energy policy, appoints the energy management team, and gives it access to the meter data and to the budget.
  4. Clause 6, planning. Run the energy review, list the significant energy uses, fix the energy baseline on at least 12 months of data, set the energy performance indicators, and write the plan for collecting the data.
  5. Clause 7, support. Competence records for the people who operate the significant energy uses, awareness for everyone else, and control of documents and records.
  6. Clause 8, operation. Control how the significant energy uses are run and maintained, and put energy performance into the specification when equipment, buildings and energy services are designed or bought.
  7. Clause 9, performance evaluation. Measure the indicators against the baseline, check legal and other requirements, run internal audits on a plan, and hold a management review.
  8. Clause 10, improvement. Log every nonconformity, find the cause, correct it, and show that energy performance improved over the period.

Who needs ISO 50001 in Iraq and Kurdistan

Cement, steel and heavy industryISO 50001 may be relevant to the management of this activity. Confirm the applicable scope and any buyer requirement before seeking certification.
Power producers and independent generationPlants selling to the Ministry of Electricity or to industrial customers are measured on fuel burned per megawatt hour.
Refineries and gas processing plantsFuel gas, flaring and utilities move the margin, and the shareholder reports the same figures every quarter.
Hotels and large commercial buildingsChillers and generators in Erbil and Baghdad run most of the day, and international hotel brands report energy per occupied room to head office.
Food factories and cold chainCold rooms and boilers run without stopping, and any investor checks the diesel bill line by line.
Water and wastewater utilitiesEnergy measurement helps assess pumping efficiency and proposed upgrades. Any funding conditions must be checked against the specific programme.
Hospitals and private clinicsBackup generation, chillers and sterilisation run around the clock on a fixed fuel budget.

The buyers that ask for ISO 50001

Buyer or listWhat they ask for
Foreign lenders and development financeCheck the financing or procurement conditions for the relevant project. Confirm whether certification is requested rather than assuming it from the sector.
European buyers under CBAMReview this buyer’s current supplier criteria for the products or services offered. Certificate scope, buyer acceptance and tender eligibility need to be checked separately.
Group head offices and foreign parentsReview this buyer’s current supplier criteria for the products or services offered. Certificate scope, buyer acceptance and tender eligibility need to be checked separately.
KRG Approved Suppliers CenterCheck the current registration instructions for your activity and category. Confirm whether this standard is requested and which issuing bodies are accepted.
Ministry of Natural Resources Approved Vendor ListCheck the current registration instructions for your activity and category. Confirm whether this standard is requested and which issuing bodies are accepted.
Kurdistan and Basra operatorsReview this buyer’s current supplier criteria for the products or services offered. Certificate scope, buyer acceptance and tender eligibility need to be checked separately.
UN agencies through UNGMCheck the individual procurement notice for the required certificate and scope. Registration on UNGM does not replace the tender’s qualification criteria.
Federal Ministry of PlanningCheck the current registration instructions for your activity and category. Confirm whether this standard is requested and which issuing bodies are accepted.

What shapes your investment

  • Number of sites and whether the auditor has to travel to Erbil, Sulaymaniyah, Baghdad or Basra.
  • Annual energy use and the number of big energy users, which set how many auditor days the audit takes.
  • How many energy sources are in scope: grid power, diesel generation, natural gas, heavy fuel oil, steam.
  • How much sub metering exists and how much has to be added before the indicators can be reported.
  • Languages the documentation is written in.
  • How much usable documentation and maintenance data already exists in the company.
  • The date the documents are needed by.
  • Whether ISO 50001 is built alone or together with ISO 14001 and ISO 9001 as one system; the certification body determines the audit time.
  • Number of findings at the audit and how much evidence is needed to close them.

The proposal names the scope, the deliverables and the dates before work starts.